Hefei-Anqing high-speed rail bridge rotates successfully
Updated: September 11, 2019 10:51 Xinhua
A drone photo taken on Sept 9 shows the construction site of the 100-meter continuous beam swivel bridge on Feixi connecting line of Hefei-Anqing high-speed railway and Hefei-Wuhan Railway. On Sept 9, the 100-meter continuous beam was successfully rotated to targeted position, and it marked a successful end to all controlling key and difficult engineering projects along the Hefei-Anqing high-speed railway. The railway starts in the newly built Hefei West Railway Station and terminates in the new Anqing West Railway Station. It is designed for speeds of up to 350 kilometers per hour and is anticipated to be finished and open in 2020. [Photo/Xinhua]
A drone photo taken on Sept 9 shows the construction site of the 100-meter continuous beam swivel bridge on Feixi connecting line of Hefei-Anqing high-speed railway and Hefei-Wuhan Railway. [Photo/Xinhua]
A drone photo taken on Sept 9 shows the construction site of the 100-meter continuous beam swivel bridge on Feixi connecting line of Hefei-Anqing high-speed railway and Hefei-Wuhan Railway. [Photo/Xinhua]

Copyright? www.gov.cn | About us | Contact us

Website Identification Code bm01000001 Registration Number: 05070218

All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to www.gov.cn.

Without written authorization from www.gov.cn, such content shall not be republished or used in any form.

Mobile

Desktop

Copyright? www.gov.cn | Contact us

Website Identification Code bm01000001

Registration Number: 05070218

a片,看黄a大片,欧美a片,日本a片,黄色a片,a片视频,美国a片,国产a片,a片毛片免费看,a片无限看,成人a片,a片大全